Osco MG0-20 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Sensoren Osco MG0-20 herunter. OSCO MG0-20 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - SLR • SLC • SLD

Oct. 2005, Rev. 9UL325 COMPLIANCE REQUIRES THE USE OF CONTACT EDGESOR PHOTOELECTRIC CONTROLS ON ALL AUTOMATIC ORREMOTELY-CONTROLLED GATE OPERATORS.OPE

Seite 2 - TABLE OF CONTENTS

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 10 -You must follow all required safety precautions and instructions at all times. Review the safety broc

Seite 3

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 11 -CURRENT SENSING ADJUSTMENTSBecause gates vary in construction and may have different force requiremen

Seite 4 - USE COPPER WIRE ONLY!

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 12 -ONBOARD L.E.D. INDICATOR DESCRIPTIONSControl Board L.E.D. Indicators:OPEN This indicator is lit when

Seite 5

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 13 -IMPORTANT NOTES FOR INSTALLATION OFMASTER/SLAVE APPLICATIONSWhen setting up Master/Slave gate operato

Seite 6

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 14 -CHARGER BOARD SLEEP MODEWhen primary AC power is not available, the operator will continue tooperate

Seite 7 - ADJUSTMENTS

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 15 -CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS

Seite 8 - LIMIT NUT ADJUSTMENTS

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 16 -CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS

Seite 9 - CONTROL BOARD ADJUSTMENTS

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 17 -CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS

Seite 10

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 18 - 12-06-12CONTROL and ACCESSORY CONNECTION ILLUSTRATIONSAC MODELS ONLY

Seite 11 - MASTER/SLAVE CONNECTION

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 19 -LOOP LAYOUT ILLUSTRATIONRefer to Connection Descriptions on page 10 and Loop Accessory Connections on

Seite 12

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 2 -TABLE OF CONTENTSPRE-INSTALLATION INFORMATIONGate Operator Classifications ...

Seite 13 - SURGE PROTECTOR INSTRUCTIONS

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 20 -EDGE LAYOUT ILLUSTRATION #1Refer to Connection Descriptions on page 10 and Contact Edge Connections o

Seite 14 - CHARGER BOARD SLEEP MODE

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 21 -EDGE LAYOUT ILLUSTRATION #2Refer to Connection Descriptions on page 10 and Contact Edge Connections o

Seite 15

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 22 -PHOTO EYE ILLUSTRATIONRefer to Connection Descriptions on page 10 and Photo Eye Connections on page 1

Seite 16

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 23 -PICKET GATE ILLUSTRATIONRefer to Connection Descriptions on page 10 and Accessory Connections on page

Seite 17

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 24 -TRACK GATE ILLUSTRATION

Seite 18 - AC MODELS ONLY

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 25 -TROUBLESHOOTINGOperator fails to start:A. If the operator has been running a large number of cycles,t

Seite 19 - LOOP LAYOUT ILLUSTRATION

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 26 -MODEL SLR MECHANICAL PARTS EXPLODED VIEW10-04-6

Seite 20 - EDGE LAYOUT ILLUSTRATION #1

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 27 -MODEL SLR MECHANICAL PARTS LISTREFNO. PART NO. DESCRIPTION1 2300-907 Operator Cover2510-354 Plunger R

Seite 21 - EDGE LAYOUT ILLUSTRATION #2

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 28 -MODEL SLC MECHANICAL PARTS EXPLODED VIEW10-04-6

Seite 22 - PHOTO EYE ILLUSTRATION

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 29 -MODEL SLC MECHANICAL PARTS LISTREFNO. PART NO. DESCRIPTION1 2300-907 Operator Cover2510-354 Plunger R

Seite 23 - PICKET GATE ILLUSTRATION

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 3 -Read the following before beginning to install OSCO slidegate operators:1. Read the yellow “Safety Ins

Seite 24 - TRACK GATE ILLUSTRATION

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 30 -10-04-6MODELS SLR • SLC CONTROL BOX PARTS LISTREFNO. PART NO. DESCRIPTION1 2100-1778-PLT Control Box

Seite 25 - TROUBLESHOOTING

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 31 -MODEL SLD MECHANICAL PARTS EXPLODED VIEW10-04-6

Seite 26

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 32 -MODEL SLD MECHANICAL PARTS LISTREFNO. PART NO. DESCRIPTION1 2300-907 Operator Cover2510-354 Plunger R

Seite 27 - SLR MECHANICAL PARTS LIST

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 33 -10-04-6MODEL SLD CONTROL BOX PARTS LISTREFNO. PART NO. DESCRIPTION1 2100-1778-PLT Control Box Wrapper

Seite 28

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 34 -BATTERY MAINTENANCEThe gel-cell batteries in this operator require no routine maintenance. For assure

Seite 29 - SLC MECHANICAL PARTS LIST

MATERIAL SAFETY DATA SHEETMOBIL SHC 6341. PRODUCT AND COMPANY IDENTIFICATIONPRODUCT NAME: MOBIL SHC 634SUPPLIER: EXXONMOBIL CORPORATION3225 GALLOWS RD

Seite 30

sso3Imperial Oil MATERIAL SAFETY DATA SHEETDate Prepared: June 12, 1997Supersedes: February 02, 1996MSDS Number: 08068Cette fiche signaletique ast aus

Seite 31

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 37 -

Seite 32 - SLD MECHANICAL PARTS LIST

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 38 -PREVENTATIVE MAINTENANCEGENERAL:OSCO gate operators are designed for many years of trouble-free opera

Seite 33 - SLD CONTROL BOX PARTS LIST

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 39 -This page intentionally left blank.

Seite 34 - BRUSH REPLACEMENT

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 4 -10-04-6WIRING SPECIFICATIONS1. Select from the chart at the bottom of this page corre-sponding to the

Seite 35 - MOBIL SHC 634

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 40 -By signing this installation checklist, I/we hereby certify that each item listed and checked above h

Seite 36 - ESSO GEAR OIL GX EXTRA 75W-90

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 5 -PAD MOUNTING INSTRUCTIONS FOR MODELSSLR, SLC & SLDBefore installing, make sure the gate rolls or s

Seite 37

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 6 -GATE BRACKET AND CHAIN ASSEMBLY INSTRUCTIONSAssemble a gate bracket (1) to the front edge of the gate,

Seite 38 - PREVENTATIVE MAINTENANCE

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 7 -VENT PLUG INSTALLATIONGear reducers used in OSCO gate operators will have solid plugs installed prior

Seite 39

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 8 -ELECTRICAL CONNECTION AND ADJUSTMENTSAll OSCO gate operators are supplied with a power disconnect swit

Seite 40 - CUSTOMER

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE- 9 -Auto Close Timer Adjustment: This 270-degree adjustable potentiometer will signal the operator to clos

Verwandte Modelle: MGR-20 | MGS-20 | ME-120 |

Kommentare zu diesen Handbüchern

Keine Kommentare